Charlottesville (Sprint) Music Pavilion
This unique music pavilion required a significant amount of poured-in place concrete that would be visible to the public in the finished product. To control both quantity and schedule, Martin Horn chose to self-perform all the concrete work. The Pavilion was a highly visible project completed in a high-traffic area with limited access.
PROJECT START: March 2005
PROJECT SIZE: 3,500 seats
PROJECT DURATION: 5 months
CONTRACT VALUE: $4,400,000
CONTRACT TYPE: Design-Build
PROJECT MANAGER: John D. (Jack) Horn
SUPERINTENDENT: Tim Patronik
ESTIMATOR: Jack M. Horn
OWNER: Charlottesville Pavilion LLC
CONTACT: Red Light Management
ARCHITECT: FTL Design Engineering
CONTACT: Bill Lenart